A pool remodel replaces the worn parts of an existing pool, usually the interior finish, the waterline tile, the coping and often the equipment, while keeping the concrete shell. In Bakersfield, a replaster with new waterline tile typically costs roughly $12,000 to $25,000 for an average residential pool, and a full remodel with new coping, decking, equipment and features can run $30,000 to $60,000 or more.
Signs your pool is due for a remodel
Rough or stained plaster. White plaster etches over time, especially with hard water and imperfect chemistry. When the surface feels like sandpaper, shows gray or brown stains that will not brush out, or has spots where the gray gunite shows through, a resurface is due.
Loose or scaled waterline tile. Calcium scale builds up at the waterline in Bakersfield's moderately hard water. Tiles that pop loose or have cracked grout let water behind them.
Cracked or loose coping. Coping stones that rock underfoot or have open joints let water into the bond beam and should be addressed before the damage spreads.
Old equipment. Single-speed pumps installed before California's variable-speed requirements cost far more to run. A pump, filter or heater nearing the end of its life is a natural trigger for a broader remodel.
A pool that no longer fits the family. A deep diving end that nobody uses, no shallow area for children, steps that are hard for an older parent, or no spa.
What a remodel can include
Interior finish
The interior surface is the core of most remodels. Crews drain the pool, chip or grind the old finish, repair any cracks, and apply a new coat.
- White plaster. The most affordable finish. Crisp and bright, but it typically needs replacing again in ten to fifteen years.
- Colored plaster and quartz. Quartz aggregate mixed into plaster adds durability and color depth for a moderate premium.
- Pebble finishes. Small polished stones bonded in cement create a textured, long-lasting surface. They cost more but often last well beyond plaster.
Tile and coping
New waterline tile is usually done at the same time as the finish, because the pool is already empty. Calcium wipes off glazed glass or porcelain far more easily than off raw stone. Coping options include precast concrete, travertine, flagstone and poured cantilevered edges.

Equipment
A remodel is the right time to replace the pump with a variable-speed model, add a cartridge filter, convert to saltwater chlorination if you want it, replace old incandescent lights with LED and add automation you can run from a phone.
Layout changes
Gunite can be added to an existing shell. Builders can add a sun shelf, a bench, new steps, a raised spa wall or a sheer descent. Large changes, such as making the pool shallower or reshaping it, involve more demolition and engineering but are often still cheaper than starting over.
Deck
Old cracked concrete decks can be resurfaced with a cool-deck coating, overlaid with pavers or replaced with travertine. See pool decks.
Remodel costs in Bakersfield
| Scope | Typical range |
|---|---|
| Drain, prep and replaster in white, average pool | $8,000–$14,000 |
| Pebble or quartz resurfacing | $12,000–$22,000 |
| New waterline tile, average perimeter | $4,000–$10,000 |
| New coping, average perimeter | $5,000–$12,000 |
| Variable-speed pump and cartridge filter | $3,000–$6,000 |
| LED lights and automation | $2,500–$6,000 |
| Add a sun shelf or bench | $5,000–$12,000 |
| Full remodel with deck replacement | $35,000–$70,000+ |
Ranges blend national cost guides and local market observations. Pool size, the condition of the shell and how much demolition is needed drive the final price. Our remodel or replace guide helps decide when a fresh start is worth it.
Do pool remodels need a permit?
A straight replaster or retile often does not need a building permit, but many remodels do. Changing the shape or structure, adding a spa, replacing equipment with new electrical or gas work, or altering doors and fencing that serve as pool barriers usually trigger permits. A permitted renovation brings the yard under the state's safety law, so plan on two qualifying barriers, covers or alarms. Check with your builder and the City of Bakersfield or Kern County.
Timing a remodel
Remodels are faster than new builds: a new finish plus waterline tile is commonly a one- to three-week job, depending on weather and how quickly the pool can be drained and filled. Spring and fall are popular because the pool is not in heavy use. Avoid scheduling a fresh plaster job for the hottest stretch of summer if possible; extreme heat during curing makes finishes harder to apply well. Water from draining must be disposed of according to local rules, which your builder should handle.
Getting a remodel bid
Ask the builder to inspect the shell for structural cracks, check the bond beam under the coping and test the plumbing for leaks before quoting a finish. A good remodel bid lists each component separately, so you can choose which upgrades to make now. Price your remodel after a builder inspects the shell.
Signs an older Bakersfield pool needs work
Pools built during the 1970s through the early 2000s are common across the northeast, the Stockdale area and Oildale, and many show the same symptoms. Rough or stained plaster that snags swimsuits, white calcium lines on the tile, loose or cracked coping, a deck with heaved slabs or wide cracks, a single-speed pump that hums loudly all day, a gas heater past 12 years old, and lights that no longer work are all reasons to start planning. Sudden water loss is different: before any cosmetic work, have a leak detection company test the shell, plumbing lines and fittings so the remodel does not cover a problem.
Order of work in a full renovation
A typical sequence is draining the pool and evaluating the shell, chipping or acid-washing the old finish, repairing cracks and adjusting steps or benches, replacing tile and coping, replacing the deck, updating plumbing and lights, then applying the new finish last and starting up the water. Equipment upgrades can happen at any point but are usually finished before start-up. Plaster and pebble finishes need careful water chemistry for the first few weeks, so follow the builder's start-up instructions closely.
Timing a remodel around the weather
Plaster applied in extreme heat cures too fast and can crack or discolor, so many crews prefer to finish pools in spring or fall, or schedule summer work very early in the morning. Spring remodel calendars fill early in Bakersfield, so contact builders in winter if you want the pool ready by Memorial Day.
Adding safety features during a remodel
Permitted remodels must leave the pool with a pair of approved safety measures. A remodel is a good time to add a safety cover, an isolation fence, exit alarms on doors or self-closing gates. Ask the builder which features fit your yard and household.
Equipment upgrades that pay back
Replacing an old single-speed pump with a variable-speed model, which California's Title 20 rules now require for most replacement pool pumps, often reduces pump electricity use substantially. Swapping incandescent lights for LEDs, adding automation, and replacing an aging heater with a more efficient unit can also cut operating costs. Combine these with the remodel so the electrician and plumber are on site once.
Choosing a new interior finish
Standard white plaster is the lowest-cost finish and lasts roughly 7 to 12 years with good chemistry. Quartz plaster adds color and durability. Pebble finishes cost more but often last 15 years or longer and hide minor staining. Glass bead finishes add shimmer at a premium. Ask to see finish samples underwater, since colors change dramatically once the pool is filled.






